Switchboards and critical power
Design and install MVSB, GMSB, USSB and TSB switchboards, cable supports and cabling. Scope includes static UPS systems, generators and power distribution units (PDUs).
A data centre brings power, cooling, building services and operating procedures into close contact. ETES delivers electrical and associated M&E installation with coordinated drawings, load calculations and power interruption plans shaped around the project requirements.
Discuss this service
Design and install MVSB, GMSB, USSB and TSB switchboards, cable supports and cabling. Scope includes static UPS systems, generators and power distribution units (PDUs).
Calculate maximum demand and size circuit breakers and cables using Ecodial and Vipcoda. Coordinate overcurrent, earth-fault and earth-leakage protection across the distribution system.
Coordinate interior renovation, structural floor strengthening and load spreading, and raised-floor systems with the electrical and M&E installation.
Provide air conditioning and mechanical ventilation (ACMV), computer-room air conditioning and water detection systems within the agreed project scope.
Scope can include dry pre-action fire protection, FM-200 suppression and VESDA detection. Confirm equipment specifications and interfaces with the project team.
Design lighting in DIALux using manufacturers’ IES files. Install socket outlets, general power, intelligent lighting controls and dimming around the required layout and illuminance.
Design and install access control, intruder alarms, CCTV, motion detection and SMS paging alerts. Define the system interfaces and monitoring requirements with the facility team.
Plan additions, alterations and electrical supply upgrades. Coordinate installation documentation and applicable approval requirements with the responsible project representatives.
Share what you have. We can identify the remaining information together.
Use these points to define the proposal, responsibilities and records your team needs. Final deliverables depend on the agreed scope.
Equipment and supply schedules covering the agreed electrical, cooling and control interfaces.
Installation and commissioning responsibilities, witness points and permitted test conditions.
Approved test results, interface records and outstanding items for the operations team.
Share the drawings, specifications and division of responsibilities. These establish the installation scope, coordination needs and any details that require clarification before work is planned.
Planning starts with the systems affected and the facility’s operating procedures. The work sequence, isolation arrangements, temporary power needs and client review points should be agreed before a shutdown is scheduled.
The project brief defines which cooling, floor, detection and security works are included. Clarifying the boundaries between ETES, equipment vendors and other contractors helps avoid gaps at system interfaces.
Tell us your site location, the work you need and your planned schedule. Drawings and equipment lists help us assess the scope.