Replacement, recovery and recommissioning
Replace, recover and recommission main switchboards (MSB), emergency main switchboards (EMSB), ACMSB and sub-boards. Confirm equipment condition and the scope of each change.
A switchboard upgrade affects every connected system, so the plan matters as much as the equipment. ETES replaces, recovers and recommissions main, emergency and associated distribution boards, with the supply interruption discussed before work begins.
Discuss this service
Replace, recover and recommission main switchboards (MSB), emergency main switchboards (EMSB), ACMSB and sub-boards. Confirm equipment condition and the scope of each change.
Prepare reflected ceiling plans and combined M&E services drawings in AutoCAD. Use Microsoft Project for the master programme and detailed schedules for individual services.
Prepare a power interruption plan (PIP) and discuss every planned shutdown with the client. Agree affected loads, work sequence and return-to-service arrangements.
Arrange temporary generator sets from 10 kVA to 1.5 MVA for shutdown work, with capacity and connection arrangements selected for the agreed loads and site conditions.
Provide protection discrimination design, relay settings and yearly servicing for supply and distribution switchboard panels.
Share what you have. We can identify the remaining information together.
Use these points to define the proposal, responsibilities and records your team needs. Final deliverables depend on the agreed scope.
Existing board assessment, replacement specifications and protection requirements.
An agreed shutdown sequence, temporary supply needs and the plan to restore service.
Installation checks, test records and updated circuit and equipment identification.
The appropriate approach depends on equipment condition, available components and the changes required. A review can establish whether recovery, a partial upgrade or replacement is the practical option.
Temporary generation can be assessed as part of shutdown planning. It requires a defined load list, suitable connections, space and an agreed changeover arrangement; it should not be assumed to cover every circuit.
The schedule depends on equipment availability, installation access, connection changes and the approved shutdown window. Confirming the existing arrangement early helps establish a workable programme.
Tell us your site location, the work you need and your planned schedule. Drawings and equipment lists help us assess the scope.