Factory and warehouse power distribution
Design and install main switchboards, sub-boards, distribution boards and power distribution for industrial factories and warehouses.
Production requirements should shape the electrical system, from the incoming supply to the equipment it serves. ETES designs and installs power distribution, lighting and ELV systems for factories and warehouses, with shutdown planning built into the scope.
Discuss this service
Design and install main switchboards, sub-boards, distribution boards and power distribution for industrial factories and warehouses.
Use Ecodial and Vipcoda to size circuit breakers and cables around the equipment requirements and distribution design.
Use manufacturers’ IES files to plan lighting for production and storage areas. Set installation spacing and mounting height to achieve the intended illuminance.
Design and install ELV systems alongside additions, alterations and electrical supply upgrades. Coordinate documentation and applicable approvals with the responsible site representatives.
Share what you have. We can identify the remaining information together.
Use these points to define the proposal, responsibilities and records your team needs. Final deliverables depend on the agreed scope.
Load schedule and design basis, including machinery interfaces and expansion allowances.
Cable routes, isolation boundaries and installation stages coordinated with production.
Agreed inspection records, circuit labels and updated distribution drawings.
That depends on available capacity, the existing distribution system and how the equipment operates. Share the new equipment ratings and current drawings so the review can cover demand, protection and connection requirements.
A phased approach can be assessed against the facility layout and electrical connections. The key is to identify which systems can be isolated independently and which activities depend on a shared shutdown.
Provide the records you have and flag known changes. Site tracing and a review of the existing installation can be included when defining the project scope.
Tell us your site location, the work you need and your planned schedule. Drawings and equipment lists help us assess the scope.