DAMAC BKK01
BMS interface verification, monitoring integration and CxL3 functional testing for PTU (E-House) systems at DAMAC BKK01.

BMS integration and CxL3 functional testing.
- Building Management System interface verification
- Monitoring integration
- CxL3 functional testing for PTU (E-House) systems
Commissioning stages.
The ETES presentation describes these three stages. The documented DAMAC BKK01 scope covers CxL3 functional testing.
- CxL1
Verify the design
- CxL2
Verify the installation
- CxL3
Verify the function
ETES scope on this project